Issue

Flood hazard

An increased flood hazard because the flood defence does not meet the requirements and/or due to extreme conditions.

The dike does not meet the norms. 

Solution

Dike improvement

There is no room for widening the river, so the dike has to be heightened and strengthened over a length of 940 meters.

Dijkverhoging om waterveiligheid te verbeteren minder overstromingsgevaar

Pros

  • Can be applied with limited available space

Characteristics

  1. Topic Water safety
  2. Development state 10: Proven in operational situation
  3. Setting type Rural area
  4. Water type Surface water
  5. Project period 4-7 years